|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Boring holes for support piers |
Preparing perimeter level |
|
Outer support rails, level to drive |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Small rails to match curvature, 100 x 50mm tanalized
|
Hours of work around curved flower bed |
Align beams at 400mm, facilitating marks for holes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Piers set between 600 and 800mm, 100 x 100 sawn, treated |
Beams scarffed to match curved wall |
|
Skeleton built to accommodate inspection hatch |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Another view |
Construction around window well |
|
Client now requests decking to shed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Level, elevated skeleton |
5 degree slope down to steps |
|
Start of top decking |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Edging strips needed |
Difficult cuts |
|
And another |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Elevated joists @ 400 centres |
Many blocks around curved wall |
|
Adapting for inspection cover |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kilometres of joists |
Removeable inspection cover |
|
Sigh of relief |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Decision made to deck far area |
Thank you whoever invented the scribe |
|
Archway changed completely |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New arris rail reversed on to original arris rail to support decking boards |
Ready to be trimmed |
|
Trimmed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Light show |
|
|
Different angle |
|
|
|
|
|
|
|
|
Supported by Wickes, Screwfix, Envirobuild, D & S Tool Hire, Crescent Building Supplies |
|
|
|
|
|
|
|